Inside and outside the building zone
- Responsibility of municipality: 5 copies (for small form, 1 copy is sufficient)
- Responsibility canton: 7 copies
- Signed building application
- Valid extract from the land register or cadastre
- Topographic map section with marking of project location
- Site plan
- Plans and documents
- Floors
- Sections
- Facades
- Surroundings
- For renovations: Photos of the existing building
- Markings or coloring of the adjustments on the photos help to visually represent the project
3 copies
- Special documents
- Earthquake form
- Fire safety report/quality assurance document (wird neu nur vom QS- Verantwortlichen ausgefüllt)
- Energy technical inspection documents
- Special applications
- Clearing
- Groundwater intervention