Registration procedure
The following works, provided they comply with statutory requirements, must be reported to the relevant authority but do not require planning permission:
- Antennas
- Thermal insulation inside the building
- Alterations to the natural ground surface
- Solar panels on gables
- Solar panels on roofs
- Installation of an air-to-air or air-to-water heat pump
- Renovation and replacement of heating systems
- Connection to a district heating scheme
Notifications to the building authority. The start and completion of works must be reported to the local authority’s building department